Incineration Process Flowchart

Incineration Process Flowchart

 

 

 
Our process includes
No. process
1. Garbage receiving and treatment procedures, including: entrance loadometer, dumping platform, garbage bunker, garbage crane, ash bunker, ash crane, burning chamber, hearth system, etc.
2. Combustion air procedures, including: primary and secondary air blower, air preheater, air reheater, etc.
3. Bottom slag procedures, including: each bottom slag conveyor, ash ejector, vibration conveyor, etc.
4. Fly ash procedures, including: fly ash conveyor, pneumatic conveying system, fly ash storage tank, fly ash stabilizer, etc.
5. Waste metal procedures, including: magnetic selector, waste metal conveyor, waste metal bunker, waste metal compressor, waste metal crane, etc.
6. Steam procedures, including: high pressure steam distributor, steam turbine, power generator, steam condenser, etc.
7. Condensed water procedures, including: condensed water recycling equipment, such as condensed water tank, degassing & water feeding tank, etc.
8. Waste gas treatment procedures, including: dioxin preventiom equipment, nitrogen oxide removal equipment, semi-dry scrubber, bag filter dust collector, attraction exhaust fan, etc.
9. Wastewater procedures, including: inorganic wastewater treatment system, organic wastewater treatment system, sludge production system, etc.